{"id":1645,"date":"2021-10-10T09:38:28","date_gmt":"2021-10-10T07:38:28","guid":{"rendered":"https:\/\/www.qair.energy\/en\/?p=1645"},"modified":"2021-12-03T16:10:45","modified_gmt":"2021-12-03T15:10:45","slug":"2-first-solar-projects-out-of-of-10-approved-in-brazil","status":"publish","type":"post","link":"https:\/\/oldprod.qair.energy\/en\/2-first-solar-projects-out-of-of-10-approved-in-brazil\/","title":{"rendered":"2 first solar projects out of a total of 10 approved in Brazil"},"content":{"rendered":"<h2><strong>These two units of 48.11 MW pave the way to a <\/strong><strong>440MW solar complex<\/strong><strong> in Ico\u0301<\/strong><\/h2>\n<p>Qair plans to build a solar complex in the state of Cear\u00e1, Brazil, wich will eventually consist of ten plants totaling 440 MW. Its first two units of 48.11 MW each have been approved in the last auction of the National Electric Energy Agency (Aneel).<\/p>\n<p>The UFV BOM JARDIM I and III project located in the town of Ic\u00f3, in the state of Cear\u00e1, should start operating by January 1st, 2026.<\/p>\n<p>BOM JARDIM I and III are the company&#8217;s first projects in Brazil to be traded on the regulated market. Qair&#8217;s intention for the complex is to have a mix of regulated and a free market contracts.<\/p>\n<p><strong>About the location<\/strong><\/p>\n<p>Cear\u00e1 has already established itself as one of the main producers of renewable wind and solar energy in Brazil. The volume of projects registered in the State confirms this position. The direct consequences are the attraction of quality investments and the generation of employment and income, especially in the construction phase of the plants.<\/p>\n<p>These projects, initially planned on the coast and relocated inland will also have a positive social and economic impact in these locations.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>These two units of 48.11 MW pave the way to a 440MW solar complex in Ico\u0301 Qair plans to build a solar complex in the state of Cear\u00e1, Brazil, wich will eventually consist of ten plants totaling 440 MW. Its first two units of 48.11 MW each have been approved in the last auction of [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":1647,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[4,1],"tags":[],"class_list":["post-1645","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-actu","category-non-classe"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v24.9 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>2 first solar projects out of a total of 10 approved in Brazil - Qair Group - EN<\/title>\n<meta name=\"description\" content=\"Qair&#039;s 2 first solar projects have been approved by Brazilian local authorities, paving the way for a 440MW total solar complex. Find out more\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/oldprod.qair.energy\/en\/2-first-solar-projects-out-of-of-10-approved-in-brazil\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"2 first solar projects out of a total of 10 approved in Brazil - Qair Group - EN\" \/>\n<meta property=\"og:description\" content=\"Qair&#039;s 2 first solar projects have been approved by Brazilian local authorities, paving the way for a 440MW total solar complex. Find out more\" \/>\n<meta property=\"og:url\" content=\"https:\/\/oldprod.qair.energy\/en\/2-first-solar-projects-out-of-of-10-approved-in-brazil\/\" \/>\n<meta property=\"og:site_name\" content=\"Qair Group - EN\" \/>\n<meta property=\"article:published_time\" content=\"2021-10-10T07:38:28+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2021-12-03T15:10:45+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/oldprod.qair.energy\/en\/wp-content\/uploads\/sites\/2\/2021\/12\/Solar-Ico\u0301-3-768x432.png\" \/>\n\t<meta property=\"og:image:width\" content=\"768\" \/>\n\t<meta property=\"og:image:height\" content=\"432\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"groupcommunication\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"groupcommunication\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/oldprod.qair.energy\/en\/2-first-solar-projects-out-of-of-10-approved-in-brazil\/\",\"url\":\"https:\/\/oldprod.qair.energy\/en\/2-first-solar-projects-out-of-of-10-approved-in-brazil\/\",\"name\":\"2 first solar projects out of a total of 10 approved in Brazil - Qair Group - EN\",\"isPartOf\":{\"@id\":\"https:\/\/oldprod.qair.energy\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/oldprod.qair.energy\/en\/2-first-solar-projects-out-of-of-10-approved-in-brazil\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/oldprod.qair.energy\/en\/2-first-solar-projects-out-of-of-10-approved-in-brazil\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/oldprod.qair.energy\/en\/wp-content\/uploads\/sites\/2\/2021\/12\/Solar-Ico\u0301-3.png\",\"datePublished\":\"2021-10-10T07:38:28+00:00\",\"dateModified\":\"2021-12-03T15:10:45+00:00\",\"author\":{\"@id\":\"https:\/\/oldprod.qair.energy\/en\/#\/schema\/person\/6239371055ea22a4ce4115c014e5ca6e\"},\"description\":\"Qair's 2 first solar projects have been approved by Brazilian local authorities, paving the way for a 440MW total solar complex. Find out more\",\"breadcrumb\":{\"@id\":\"https:\/\/oldprod.qair.energy\/en\/2-first-solar-projects-out-of-of-10-approved-in-brazil\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/oldprod.qair.energy\/en\/2-first-solar-projects-out-of-of-10-approved-in-brazil\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/oldprod.qair.energy\/en\/2-first-solar-projects-out-of-of-10-approved-in-brazil\/#primaryimage\",\"url\":\"https:\/\/oldprod.qair.energy\/en\/wp-content\/uploads\/sites\/2\/2021\/12\/Solar-Ico\u0301-3.png\",\"contentUrl\":\"https:\/\/oldprod.qair.energy\/en\/wp-content\/uploads\/sites\/2\/2021\/12\/Solar-Ico\u0301-3.png\",\"width\":3840,\"height\":2160,\"caption\":\"Qair solar plant Ico\u0301, Brazil\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/oldprod.qair.energy\/en\/2-first-solar-projects-out-of-of-10-approved-in-brazil\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Accueil\",\"item\":\"https:\/\/oldprod.qair.energy\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"2 first solar projects out of a total of 10 approved in Brazil\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/oldprod.qair.energy\/en\/#website\",\"url\":\"https:\/\/oldprod.qair.energy\/en\/\",\"name\":\"Qair Group - EN\",\"description\":\"Un site utilisant WordPress\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/oldprod.qair.energy\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/oldprod.qair.energy\/en\/#\/schema\/person\/6239371055ea22a4ce4115c014e5ca6e\",\"name\":\"groupcommunication\",\"url\":\"https:\/\/oldprod.qair.energy\/en\/author\/groupcommunication\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"2 first solar projects out of a total of 10 approved in Brazil - Qair Group - EN","description":"Qair's 2 first solar projects have been approved by Brazilian local authorities, paving the way for a 440MW total solar complex. Find out more","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/oldprod.qair.energy\/en\/2-first-solar-projects-out-of-of-10-approved-in-brazil\/","og_locale":"en_US","og_type":"article","og_title":"2 first solar projects out of a total of 10 approved in Brazil - Qair Group - EN","og_description":"Qair's 2 first solar projects have been approved by Brazilian local authorities, paving the way for a 440MW total solar complex. Find out more","og_url":"https:\/\/oldprod.qair.energy\/en\/2-first-solar-projects-out-of-of-10-approved-in-brazil\/","og_site_name":"Qair Group - EN","article_published_time":"2021-10-10T07:38:28+00:00","article_modified_time":"2021-12-03T15:10:45+00:00","og_image":[{"width":768,"height":432,"url":"https:\/\/oldprod.qair.energy\/en\/wp-content\/uploads\/sites\/2\/2021\/12\/Solar-Ico\u0301-3-768x432.png","type":"image\/png"}],"author":"groupcommunication","twitter_card":"summary_large_image","twitter_misc":{"Written by":"groupcommunication","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/oldprod.qair.energy\/en\/2-first-solar-projects-out-of-of-10-approved-in-brazil\/","url":"https:\/\/oldprod.qair.energy\/en\/2-first-solar-projects-out-of-of-10-approved-in-brazil\/","name":"2 first solar projects out of a total of 10 approved in Brazil - Qair Group - EN","isPartOf":{"@id":"https:\/\/oldprod.qair.energy\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/oldprod.qair.energy\/en\/2-first-solar-projects-out-of-of-10-approved-in-brazil\/#primaryimage"},"image":{"@id":"https:\/\/oldprod.qair.energy\/en\/2-first-solar-projects-out-of-of-10-approved-in-brazil\/#primaryimage"},"thumbnailUrl":"https:\/\/oldprod.qair.energy\/en\/wp-content\/uploads\/sites\/2\/2021\/12\/Solar-Ico\u0301-3.png","datePublished":"2021-10-10T07:38:28+00:00","dateModified":"2021-12-03T15:10:45+00:00","author":{"@id":"https:\/\/oldprod.qair.energy\/en\/#\/schema\/person\/6239371055ea22a4ce4115c014e5ca6e"},"description":"Qair's 2 first solar projects have been approved by Brazilian local authorities, paving the way for a 440MW total solar complex. Find out more","breadcrumb":{"@id":"https:\/\/oldprod.qair.energy\/en\/2-first-solar-projects-out-of-of-10-approved-in-brazil\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/oldprod.qair.energy\/en\/2-first-solar-projects-out-of-of-10-approved-in-brazil\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/oldprod.qair.energy\/en\/2-first-solar-projects-out-of-of-10-approved-in-brazil\/#primaryimage","url":"https:\/\/oldprod.qair.energy\/en\/wp-content\/uploads\/sites\/2\/2021\/12\/Solar-Ico\u0301-3.png","contentUrl":"https:\/\/oldprod.qair.energy\/en\/wp-content\/uploads\/sites\/2\/2021\/12\/Solar-Ico\u0301-3.png","width":3840,"height":2160,"caption":"Qair solar plant Ico\u0301, Brazil"},{"@type":"BreadcrumbList","@id":"https:\/\/oldprod.qair.energy\/en\/2-first-solar-projects-out-of-of-10-approved-in-brazil\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Accueil","item":"https:\/\/oldprod.qair.energy\/en\/"},{"@type":"ListItem","position":2,"name":"2 first solar projects out of a total of 10 approved in Brazil"}]},{"@type":"WebSite","@id":"https:\/\/oldprod.qair.energy\/en\/#website","url":"https:\/\/oldprod.qair.energy\/en\/","name":"Qair Group - EN","description":"Un site utilisant WordPress","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/oldprod.qair.energy\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/oldprod.qair.energy\/en\/#\/schema\/person\/6239371055ea22a4ce4115c014e5ca6e","name":"groupcommunication","url":"https:\/\/oldprod.qair.energy\/en\/author\/groupcommunication\/"}]}},"_links":{"self":[{"href":"https:\/\/oldprod.qair.energy\/en\/wp-json\/wp\/v2\/posts\/1645","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/oldprod.qair.energy\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/oldprod.qair.energy\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/oldprod.qair.energy\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/oldprod.qair.energy\/en\/wp-json\/wp\/v2\/comments?post=1645"}],"version-history":[{"count":1,"href":"https:\/\/oldprod.qair.energy\/en\/wp-json\/wp\/v2\/posts\/1645\/revisions"}],"predecessor-version":[{"id":1648,"href":"https:\/\/oldprod.qair.energy\/en\/wp-json\/wp\/v2\/posts\/1645\/revisions\/1648"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/oldprod.qair.energy\/en\/wp-json\/wp\/v2\/media\/1647"}],"wp:attachment":[{"href":"https:\/\/oldprod.qair.energy\/en\/wp-json\/wp\/v2\/media?parent=1645"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/oldprod.qair.energy\/en\/wp-json\/wp\/v2\/categories?post=1645"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/oldprod.qair.energy\/en\/wp-json\/wp\/v2\/tags?post=1645"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}