{"id":2056,"date":"2022-09-26T10:03:11","date_gmt":"2022-09-26T08:03:11","guid":{"rendered":"https:\/\/www.qair.energy\/en\/?p=2056"},"modified":"2022-09-26T10:03:11","modified_gmt":"2022-09-26T08:03:11","slug":"poland-qair-commissions-olszowka-wind-farm","status":"publish","type":"post","link":"https:\/\/oldprod.qair.energy\/en\/poland-qair-commissions-olszowka-wind-farm\/","title":{"rendered":"Poland: Qair commissions Olsz\u00f3wka wind farm"},"content":{"rendered":"<p>&nbsp;<\/p>\n<p style=\"text-align: center;\"><strong>The project consists of:<\/strong><\/p>\n<p style=\"text-align: center;\">6 wind turbines with a total capacity of 12.8 MW<\/p>\n<p style=\"text-align: center;\">Meeting the energy demand of circ. 24,000 households<\/p>\n<p style=\"text-align: center;\">Avoiding the emission of circ. 33,700 tonnes of CO<sub>2<\/sub> per year<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p><strong>Wroc\u0142aw, 26 September 2022 &#8211; <\/strong>Qair announces the commissioning of its seventh wind farm in Poland. The 12.8 MW project is located in Olsz\u00f3wka, in the Wielkopolskie Voivodeship. After less than two years since the launch of the design phase, electricity will flow from the wind park, which could meet the energy demand of approximately 24,000 households. The group currently owns and operates 258 MW of installed operating capacity in wind and photovoltaic farms in Poland.<\/p>\n<p>The Olsz\u00f3wka Wind Park will generate 43 GWh of electricity per year. The project consists of six Vestas turbines of which four 2.2 MW and two 2 MW. The electricity produced in Olsz\u00f3wka will avoid the annual emission of approximately 33,700 tonnes of CO<sub>2<\/sub> .<\/p>\n<blockquote><p><em>The Olsz\u00f3wka farm is the second wind farm project that we have put into operation in recent months. Poland deserves an even more affordable electricity from RES and we can contribute to make a positive difference. With the soaring energy prices, both businesses and individuals are awaiting solutions. In the coming months, we plan to complete the construction of four additional wind farms and ten photovoltaic projects, increasing our operating volume to almost 400 MW.<\/em> \u2013 <strong>says Krzysztof Wojtysiak, CEO of Qair Polska.<\/strong><\/p><\/blockquote>\n<p>Indeed, by the end of 2022, Qair plans to commission new wind farms in W\u0105dro\u017ce Wielkie and Wisznice. In 2023, projects with a total capacity of 82 MW will enter the operational phase, including those in Stawiszyn and Widuchowa, as well as an over 80-hectare photovoltaic farm in Kalisz Pomorski, and nine smaller PV farms located in Dolny \u015al\u0105sk and Wielkopolska. At the same time, Qair is negotiating contracts for the implementation of 3 photovoltaic farms with a total capacity of 120 MW, the implementation of which will be completed at the end of the next year. The company will then reach a significant development milestone with 0.5 GW of installed capacity in Poland.<\/p>\n<p>Currently, Qair owns and operates seven wind parks in Rzepin, Linowo, Udanin, Wrze\u015bnia, Parz\u0119czew, Rychwa\u0142 and Olsz\u00f3wka generating electricity through a total of 93 wind turbines with an installed capacity of 205 MW. Additionally, the project portfolio is supplemented by photovoltaic farms with a total capacity of 53 MW.<\/p>\n<p>&nbsp;<\/p>\n<p><strong style=\"color: #003399;\">About Qair<\/strong><\/p>\n<p>Qair is an independent producer of renewable energy, developing, building and operating wind, solar, hydroelectric and green hydrogen projects on own account. Qair operates 860 MW and targets 1GW of capacity by the end of 2022. Active in 21 countries across Europe, Latin America, Africa, and Asia, our ambition is to become an independent leader in responsible energy.<\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<p><strong style=\"color: #003399;\">A subsidiary of Qair Group, Qair Polska<\/strong> has been operating on the Polish market since 2015.<\/p>\n<p>Qair Polska currently employs over 80 specialists, has a portfolio of wind and photovoltaic assets including: 258 MW of fully operational projects, 130 MW in the implementation phase and over 2.5 GW in the early stage of development.<\/p>\n<p>Qair Polska also participates in the process of obtaining location permits for offshore wind farms in the Baltic Sea. Qair Polska focuses on its own projects, partners with external companies, and acquires projects at various stages of development.<\/p>\n<p>&nbsp;<\/p>\n<p><strong style=\"color: #003399;\">Contact Qair<\/strong><\/p>\n<p>\u2022 Daria Soroka \u2013 Poland PR Specialist: <a style=\"color: #0099ff;\" href=\"mailto:d.soroka@qair.energy\">d.soroka@qair.energy<\/a><\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>&nbsp; The project consists of: 6 wind turbines with a total capacity of 12.8 MW Meeting the energy demand of circ. 24,000 households Avoiding the emission of circ. 33,700 tonnes of CO2 per year &nbsp; &nbsp; Wroc\u0142aw, 26 September 2022 &#8211; Qair announces the commissioning of its seventh wind farm in Poland. The 12.8 MW [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":2068,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[4,1,68],"tags":[],"class_list":["post-2056","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-actu","category-non-classe","category-press-release"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v24.9 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Poland: Qair commissions Olsz\u00f3wka wind farm - Qair Group - EN<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/oldprod.qair.energy\/en\/poland-qair-commissions-olszowka-wind-farm\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Poland: Qair commissions Olsz\u00f3wka wind farm - Qair Group - EN\" \/>\n<meta property=\"og:description\" content=\"&nbsp; The project consists of: 6 wind turbines with a total capacity of 12.8 MW Meeting the energy demand of circ. 24,000 households Avoiding the emission of circ. 33,700 tonnes of CO2 per year &nbsp; &nbsp; Wroc\u0142aw, 26 September 2022 &#8211; Qair announces the commissioning of its seventh wind farm in Poland. The 12.8 MW [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/oldprod.qair.energy\/en\/poland-qair-commissions-olszowka-wind-farm\/\" \/>\n<meta property=\"og:site_name\" content=\"Qair Group - EN\" \/>\n<meta property=\"article:published_time\" content=\"2022-09-26T08:03:11+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/oldprod.qair.energy\/en\/wp-content\/uploads\/sites\/2\/2022\/09\/MicrosoftTeams-image-3-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1556\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"groupcommunication\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"groupcommunication\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/oldprod.qair.energy\/en\/poland-qair-commissions-olszowka-wind-farm\/\",\"url\":\"https:\/\/oldprod.qair.energy\/en\/poland-qair-commissions-olszowka-wind-farm\/\",\"name\":\"Poland: Qair commissions Olsz\u00f3wka wind farm - Qair Group - EN\",\"isPartOf\":{\"@id\":\"https:\/\/oldprod.qair.energy\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/oldprod.qair.energy\/en\/poland-qair-commissions-olszowka-wind-farm\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/oldprod.qair.energy\/en\/poland-qair-commissions-olszowka-wind-farm\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/oldprod.qair.energy\/en\/wp-content\/uploads\/sites\/2\/2022\/09\/MicrosoftTeams-image-3-scaled.jpg\",\"datePublished\":\"2022-09-26T08:03:11+00:00\",\"author\":{\"@id\":\"https:\/\/oldprod.qair.energy\/en\/#\/schema\/person\/6239371055ea22a4ce4115c014e5ca6e\"},\"breadcrumb\":{\"@id\":\"https:\/\/oldprod.qair.energy\/en\/poland-qair-commissions-olszowka-wind-farm\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/oldprod.qair.energy\/en\/poland-qair-commissions-olszowka-wind-farm\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/oldprod.qair.energy\/en\/poland-qair-commissions-olszowka-wind-farm\/#primaryimage\",\"url\":\"https:\/\/oldprod.qair.energy\/en\/wp-content\/uploads\/sites\/2\/2022\/09\/MicrosoftTeams-image-3-scaled.jpg\",\"contentUrl\":\"https:\/\/oldprod.qair.energy\/en\/wp-content\/uploads\/sites\/2\/2022\/09\/MicrosoftTeams-image-3-scaled.jpg\",\"width\":2560,\"height\":1556},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/oldprod.qair.energy\/en\/poland-qair-commissions-olszowka-wind-farm\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Accueil\",\"item\":\"https:\/\/oldprod.qair.energy\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Poland: Qair commissions Olsz\u00f3wka wind farm\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/oldprod.qair.energy\/en\/#website\",\"url\":\"https:\/\/oldprod.qair.energy\/en\/\",\"name\":\"Qair Group - EN\",\"description\":\"Un site utilisant WordPress\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/oldprod.qair.energy\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/oldprod.qair.energy\/en\/#\/schema\/person\/6239371055ea22a4ce4115c014e5ca6e\",\"name\":\"groupcommunication\",\"url\":\"https:\/\/oldprod.qair.energy\/en\/author\/groupcommunication\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Poland: Qair commissions Olsz\u00f3wka wind farm - Qair Group - EN","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/oldprod.qair.energy\/en\/poland-qair-commissions-olszowka-wind-farm\/","og_locale":"en_US","og_type":"article","og_title":"Poland: Qair commissions Olsz\u00f3wka wind farm - Qair Group - EN","og_description":"&nbsp; The project consists of: 6 wind turbines with a total capacity of 12.8 MW Meeting the energy demand of circ. 24,000 households Avoiding the emission of circ. 33,700 tonnes of CO2 per year &nbsp; &nbsp; Wroc\u0142aw, 26 September 2022 &#8211; Qair announces the commissioning of its seventh wind farm in Poland. The 12.8 MW [&hellip;]","og_url":"https:\/\/oldprod.qair.energy\/en\/poland-qair-commissions-olszowka-wind-farm\/","og_site_name":"Qair Group - EN","article_published_time":"2022-09-26T08:03:11+00:00","og_image":[{"width":2560,"height":1556,"url":"https:\/\/oldprod.qair.energy\/en\/wp-content\/uploads\/sites\/2\/2022\/09\/MicrosoftTeams-image-3-scaled.jpg","type":"image\/jpeg"}],"author":"groupcommunication","twitter_card":"summary_large_image","twitter_misc":{"Written by":"groupcommunication","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/oldprod.qair.energy\/en\/poland-qair-commissions-olszowka-wind-farm\/","url":"https:\/\/oldprod.qair.energy\/en\/poland-qair-commissions-olszowka-wind-farm\/","name":"Poland: Qair commissions Olsz\u00f3wka wind farm - Qair Group - EN","isPartOf":{"@id":"https:\/\/oldprod.qair.energy\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/oldprod.qair.energy\/en\/poland-qair-commissions-olszowka-wind-farm\/#primaryimage"},"image":{"@id":"https:\/\/oldprod.qair.energy\/en\/poland-qair-commissions-olszowka-wind-farm\/#primaryimage"},"thumbnailUrl":"https:\/\/oldprod.qair.energy\/en\/wp-content\/uploads\/sites\/2\/2022\/09\/MicrosoftTeams-image-3-scaled.jpg","datePublished":"2022-09-26T08:03:11+00:00","author":{"@id":"https:\/\/oldprod.qair.energy\/en\/#\/schema\/person\/6239371055ea22a4ce4115c014e5ca6e"},"breadcrumb":{"@id":"https:\/\/oldprod.qair.energy\/en\/poland-qair-commissions-olszowka-wind-farm\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/oldprod.qair.energy\/en\/poland-qair-commissions-olszowka-wind-farm\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/oldprod.qair.energy\/en\/poland-qair-commissions-olszowka-wind-farm\/#primaryimage","url":"https:\/\/oldprod.qair.energy\/en\/wp-content\/uploads\/sites\/2\/2022\/09\/MicrosoftTeams-image-3-scaled.jpg","contentUrl":"https:\/\/oldprod.qair.energy\/en\/wp-content\/uploads\/sites\/2\/2022\/09\/MicrosoftTeams-image-3-scaled.jpg","width":2560,"height":1556},{"@type":"BreadcrumbList","@id":"https:\/\/oldprod.qair.energy\/en\/poland-qair-commissions-olszowka-wind-farm\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Accueil","item":"https:\/\/oldprod.qair.energy\/en\/"},{"@type":"ListItem","position":2,"name":"Poland: Qair commissions Olsz\u00f3wka wind farm"}]},{"@type":"WebSite","@id":"https:\/\/oldprod.qair.energy\/en\/#website","url":"https:\/\/oldprod.qair.energy\/en\/","name":"Qair Group - EN","description":"Un site utilisant WordPress","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/oldprod.qair.energy\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/oldprod.qair.energy\/en\/#\/schema\/person\/6239371055ea22a4ce4115c014e5ca6e","name":"groupcommunication","url":"https:\/\/oldprod.qair.energy\/en\/author\/groupcommunication\/"}]}},"_links":{"self":[{"href":"https:\/\/oldprod.qair.energy\/en\/wp-json\/wp\/v2\/posts\/2056","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/oldprod.qair.energy\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/oldprod.qair.energy\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/oldprod.qair.energy\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/oldprod.qair.energy\/en\/wp-json\/wp\/v2\/comments?post=2056"}],"version-history":[{"count":8,"href":"https:\/\/oldprod.qair.energy\/en\/wp-json\/wp\/v2\/posts\/2056\/revisions"}],"predecessor-version":[{"id":2067,"href":"https:\/\/oldprod.qair.energy\/en\/wp-json\/wp\/v2\/posts\/2056\/revisions\/2067"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/oldprod.qair.energy\/en\/wp-json\/wp\/v2\/media\/2068"}],"wp:attachment":[{"href":"https:\/\/oldprod.qair.energy\/en\/wp-json\/wp\/v2\/media?parent=2056"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/oldprod.qair.energy\/en\/wp-json\/wp\/v2\/categories?post=2056"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/oldprod.qair.energy\/en\/wp-json\/wp\/v2\/tags?post=2056"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}