{"id":2562,"date":"2023-04-21T12:57:03","date_gmt":"2023-04-21T10:57:03","guid":{"rendered":"https:\/\/www.qair.energy\/en\/?p=2562"},"modified":"2023-04-21T12:57:17","modified_gmt":"2023-04-21T10:57:17","slug":"poland-qair-commissions-17-5-mw-wind-park-in-wadroze-wielkie","status":"publish","type":"post","link":"https:\/\/oldprod.qair.energy\/en\/poland-qair-commissions-17-5-mw-wind-park-in-wadroze-wielkie\/","title":{"rendered":"Poland: Qair commissions 17.5 MW Wind Park in W\u0105dro\u017ce Wielkie"},"content":{"rendered":"<p style=\"text-align: center;\"><strong>Qair Polska received concession for the generation of electricity\u00a0\u00a0<\/strong><\/p>\n<p style=\"text-align: center;\"><strong>The project consists of seven 2.5 MW wind turbines\u00a0<\/strong><\/p>\n<p style=\"text-align: center;\"><strong>Energy from the project could meet the energy demand of approx. 30,000 households\u00a0<\/strong><\/p>\n<p style=\"text-align: center;\"><strong>Renewable energy produced in W\u0105dro\u017ce Wielkie will prevent nearly 50,000 tonnes of CO2 emissions per year\u00a0<\/strong><\/p>\n<p><span data-ccp-props=\"{&quot;335551550&quot;:6,&quot;335551620&quot;:6}\">\u00a0<\/span><\/p>\n<p><b><span data-contrast=\"none\">Wroc\u0142aw, April 19, 2023 &#8211; <\/span><\/b><span data-contrast=\"auto\">Qair announces the commissioning of a 17.5 MW Wind Park located in the W\u0105dro\u017ce Wielkie commune. The estimated level of energy production from the installation is 60 GWh per year, which gives the possibility to supply energy to a town with approx. 90,000 residents. Despite the so-called 10H<\/span><span data-contrast=\"auto\">i<\/span><span data-contrast=\"auto\"> Act being in force during construction, the project was favoured by the Commune authorities and accepted by the residents.\u00a0<\/span><span data-ccp-props=\"{&quot;335551550&quot;:6,&quot;335551620&quot;:6}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">Qair\u2019s eighth Wind Park in Poland, the W\u0105dro\u017ce Wielkie power plant consists of seven wind turbines, with a capacity of 2.5 MW each. Renewable energy from the new plant could power approx. 30,000 households. Annual energy production of 60 GWh will reduce carbon dioxide emissions by approx. 50,000 tonnes per year compared to emissions from conventional energy sources.\u00a0<\/span><span data-ccp-props=\"{&quot;335551550&quot;:6,&quot;335551620&quot;:6}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">The Head of the W\u0105dro\u017ce Wielkie Commune, El\u017cbieta Jedlecka, views the presence of RES projects through the prism of new development opportunities, both in terms of increasing budget revenues and attracting new investors.\u00a0\u00a0<\/span><span data-ccp-props=\"{&quot;335551550&quot;:6,&quot;335551620&quot;:6}\">\u00a0<\/span><\/p>\n<p><span data-ccp-props=\"{&quot;335551550&quot;:6,&quot;335551620&quot;:6}\">\u00a0<\/span><\/p>\n<p style=\"padding-left: 40px;\"><i><span data-contrast=\"auto\">From the point of view of the Head of the Commune, the financial benefits in the form of tax and other fees are of key importance as they will increase the commune\u2019s own income and thus allow for the implementation of many needed investments. The wind project also means the creation of jobs during construction and permanent employment during the operation. It is also a clear signal for potential investors that it is worth investing in our Commune.\u202f<\/span><\/i><i><span data-contrast=\"auto\">We <\/span><\/i><i><span data-contrast=\"auto\">are proud<\/span><\/i><i><span data-contrast=\"auto\"> that our<\/span><\/i><i><span data-contrast=\"auto\"> local government supports the development of renewable energy in our country.<\/span><\/i><span data-contrast=\"auto\"> \u2013 <strong>says El\u017cbieta Jedlecka.<\/strong><\/span><strong>\u00a0<\/strong><\/p>\n<p><span data-ccp-props=\"{&quot;335551550&quot;:6,&quot;335551620&quot;:6}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">In the case of the W\u0105dro\u017ce Wielkie Commune, the <\/span><span data-contrast=\"none\">receptiveness<\/span><span data-contrast=\"auto\"> of the entire community resulted in project development plans and the opening of a new Qair operating centre.\u00a0<\/span><span data-ccp-props=\"{&quot;335551550&quot;:6,&quot;335551620&quot;:6}\">\u00a0<\/span><\/p>\n<p><span data-ccp-props=\"{&quot;335551550&quot;:6,&quot;335551620&quot;:6}\">\u00a0<\/span><\/p>\n<p style=\"padding-left: 40px;\"><i><span data-contrast=\"auto\">The launch of the Wind Park in W\u0105dro\u017ce Wielkie is another step towards the development of the production and sale of renewable energy based on a mix of an auction system and cPPA agreements. We are happy about the openness to cooperation of the authorities and residents of the communes where our power plants are located. I would like to emphasise the <\/span><\/i><i><span data-contrast=\"auto\">responsiveness<\/span><\/i><i><span data-contrast=\"auto\"> of Ms El\u017cbieta Jedlecka, Head of the W\u0105dro\u017ce Wielkie Commune, in favour of projects related to renewable energy, who noticed a number of tangible benefits resulting from the implementation of RES projects for the local community many years ago. Such a foresight shows that smaller communes can also support Poland\u2019s energy transformation<\/span><\/i><span data-contrast=\"auto\"> \u2013 <strong>says Krzysztof Wojtysiak, CEO of Qair Polska.<\/strong><\/span><strong><i>\u00a0<\/i>\u00a0<\/strong><\/p>\n<p>&nbsp;<\/p>\n<p><span data-contrast=\"none\">Qair investment portfolio currently includes more than 60 renewable energy production projects in Poland, including eight Wind Parks in: Udanin, Rzepin, Linowo, Wrze\u015bnia, Parz\u0119czew, Rychwa\u0142, Olsz\u00f3wka and W\u0105dro\u017ce Wielkie. All Wind Parks comprise 100 turbines with a total capacity of 222.5 MW.\u00a0<\/span><span data-ccp-props=\"{&quot;335551550&quot;:6,&quot;335551620&quot;:6}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"none\">The Company is currently developing:\u00a0<\/span><span data-ccp-props=\"{&quot;335551550&quot;:6,&quot;335551620&quot;:6}\">\u00a0<\/span><\/p>\n<p>&nbsp;<\/p>\n<ul>\n<li data-leveltext=\"-\" data-font=\"Calibri\" data-listid=\"6\" data-list-defn-props=\"{&quot;335551671&quot;:0,&quot;335552541&quot;:1,&quot;335559684&quot;:-2,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Calibri&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;-&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" aria-setsize=\"-1\" data-aria-posinset=\"0\" data-aria-level=\"1\"><span data-contrast=\"none\">\u00a0final phase of a 30 MW wind project in Wisznice;\u00a0<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/li>\n<li data-leveltext=\"-\" data-font=\"Calibri\" data-listid=\"6\" data-list-defn-props=\"{&quot;335551671&quot;:0,&quot;335552541&quot;:1,&quot;335559684&quot;:-2,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Calibri&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;-&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" aria-setsize=\"-1\" data-aria-posinset=\"0\" data-aria-level=\"1\"><span data-contrast=\"none\">large-scale photovoltaic farm projects totalling 180 MW of capacity;<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/li>\n<li data-leveltext=\"-\" data-font=\"Calibri\" data-listid=\"6\" data-list-defn-props=\"{&quot;335551671&quot;:0,&quot;335552541&quot;:1,&quot;335559684&quot;:-2,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Calibri&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;-&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" aria-setsize=\"-1\" data-aria-posinset=\"0\" data-aria-level=\"1\"><span data-contrast=\"none\">\u00a0more than a dozen smaller solar power plants as part of the Stoszowice project and two wind farms in: Widuchowa and Stawiszyn.\u00a0\u00a0<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/li>\n<\/ul>\n<p><span data-ccp-props=\"{&quot;335551550&quot;:6,&quot;335551620&quot;:6}\">\u00a0<\/span><\/p>\n<p style=\"padding-left: 40px;\"><i><span data-contrast=\"auto\">W\u0105dro\u017ce Wielkie is one of several Communes where the local community can find work not only during construction, but also <\/span><\/i><span data-contrast=\"none\">throughout<\/span><i><span data-contrast=\"auto\"> the operational phase. Our Company is opening here its 3rd operational centre in Poland, which will provide technical support for both the new project and the Udanin project located in the neighbouring commune. In total, the complex will have 27 wind turbines and will be the largest complex of Qair\u2019s wind turbines in Poland. The total capacity will reach 68 MW, and we plan to build more turbines soon after the change to the 10H regulations, as we already have the capacity to connect more turbines to the grid.<\/span><\/i><span data-contrast=\"auto\"> \u2013 <strong>adds Krzysztof Wojtysiak.<\/strong><\/span><i><span data-contrast=\"auto\">\u00a0\u00a0\u00a0<\/span><\/i><span data-ccp-props=\"{&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559685&quot;:284,&quot;335559737&quot;:283}\">\u00a0<\/span><\/p>\n<p><span data-ccp-props=\"{&quot;335551550&quot;:6,&quot;335551620&quot;:6}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"none\">The project in the W\u0105dro\u017ce Wielkie Commune was completed in cooperation in partnership with SPIE Elbud Gda\u0144sk S.A., as Main Contractor and Bilfinger Tebodin, as Contract Engineer. The supplier of the turbines and the provider of technical maintenance services is General Electric.\u00a0\u00a0<\/span><span data-ccp-props=\"{&quot;335551550&quot;:6,&quot;335551620&quot;:6}\">\u00a0<\/span><\/p>\n<p><span data-ccp-props=\"{&quot;335551550&quot;:6,&quot;335551620&quot;:6}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">*<\/span><span data-ccp-props=\"{&quot;335551550&quot;:6,&quot;335551620&quot;:6}\">\u00a0<\/span><\/p>\n<p><strong style=\"color: #003399;\">A subsidiary of Qair Group, Qair Polska<\/strong> has been operating on the Polish market since 2015. Qair Polska currently employs over 90 specialists, has a portfolio of wind and photovoltaic assets including: 308 MW of fully operational projects, 200 MW in the implementation phase and over 2.5 GW in the early phase of development. Qair Polska also participates in the process of obtaining location permits for offshore wind farms in the Baltic Sea and offers the sale of power to large business entities under long-term cPPA agreements.\u00a0<span data-ccp-props=\"{&quot;335551550&quot;:6,&quot;335551620&quot;:6}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"none\">More information: <\/span><a style=\"color: #0099ff;\" href=\"https:\/\/www.qair.energy\/pl\/\/\"><span data-contrast=\"none\">qair.energy<\/span><\/a><span data-ccp-props=\"{&quot;335551550&quot;:6,&quot;335551620&quot;:6}\">\u00a0<\/span><\/p>\n<p><span data-ccp-props=\"{&quot;335551550&quot;:6,&quot;335551620&quot;:6}\">\u00a0<\/span><\/p>\n<p><strong style=\"color: #003399;\">Qair Group<\/strong><\/p>\n<p>Qair is an independent renewable electricity producer. It develops, finances, constructs and operates projects related to the production and storage of solar energy, onshore and offshore wind energy, hydroelectricity, waste-to-energy and green hydrogen.<\/p>\n<p><span data-contrast=\"auto\">The Group has more than 1 GW of capacity in operation or under construction. It is developing a portfolio pipeline of 30 GW in 20 countries across Europe, Latin America and Africa. It employs 550 employees. The Group\u2019s ambition is to become an independent leader in the renewable energy sector.<\/span><span data-ccp-props=\"{&quot;335551550&quot;:6,&quot;335551620&quot;:6}\">\u00a0<\/span><\/p>\n<p><span data-ccp-props=\"{&quot;335551550&quot;:6,&quot;335551620&quot;:6}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"none\">*<\/span><span data-ccp-props=\"{&quot;335551550&quot;:6,&quot;335551620&quot;:6}\">\u00a0<\/span><\/p>\n<p>&nbsp;<\/p>\n<p><strong style=\"color: #003399;\">Contact Qair<\/strong><\/p>\n<p>Daria Soroka | Qair Polska PR Specialist | <a style=\"color: #0099ff;\" href=\"mailto:d.soroka@qair.energy\"><span data-contrast=\"none\">d.soroka@qair.energy<\/span><\/a><span data-contrast=\"none\"> | t: + 48 797\u202f594\u202f038\u00a0<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Qair Polska received concession for the generation of electricity\u00a0\u00a0 The project consists of seven 2.5 MW wind turbines\u00a0 Energy from the project could meet the energy demand of approx. 30,000 households\u00a0 Renewable energy produced in W\u0105dro\u017ce Wielkie will prevent nearly 50,000 tonnes of CO2 emissions per year\u00a0 \u00a0 Wroc\u0142aw, April 19, 2023 &#8211; Qair announces [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":2572,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[4,5,1,68],"tags":[],"class_list":["post-2562","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-actu","category-a-la-une","category-non-classe","category-press-release"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v24.9 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Poland: Qair commissions 17.5 MW Wind Park in W\u0105dro\u017ce Wielkie - Qair Group - EN<\/title>\n<meta name=\"description\" content=\"Qair announces the commissioning of a 17.5 MW Wind Park located in the W\u0105dro\u017ce Wielkie commune.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/oldprod.qair.energy\/en\/poland-qair-commissions-17-5-mw-wind-park-in-wadroze-wielkie\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Poland: Qair commissions 17.5 MW Wind Park in W\u0105dro\u017ce Wielkie - Qair Group - EN\" \/>\n<meta property=\"og:description\" content=\"Qair announces the commissioning of a 17.5 MW Wind Park located in the W\u0105dro\u017ce Wielkie commune.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/oldprod.qair.energy\/en\/poland-qair-commissions-17-5-mw-wind-park-in-wadroze-wielkie\/\" \/>\n<meta property=\"og:site_name\" content=\"Qair Group - EN\" \/>\n<meta property=\"article:published_time\" content=\"2023-04-21T10:57:03+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-04-21T10:57:17+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/oldprod.qair.energy\/en\/wp-content\/uploads\/sites\/2\/2023\/04\/MicrosoftTeams-image-7-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1920\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"groupcommunication\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"groupcommunication\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/oldprod.qair.energy\/en\/poland-qair-commissions-17-5-mw-wind-park-in-wadroze-wielkie\/\",\"url\":\"https:\/\/oldprod.qair.energy\/en\/poland-qair-commissions-17-5-mw-wind-park-in-wadroze-wielkie\/\",\"name\":\"Poland: Qair commissions 17.5 MW Wind Park in W\u0105dro\u017ce Wielkie - Qair Group - EN\",\"isPartOf\":{\"@id\":\"https:\/\/oldprod.qair.energy\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/oldprod.qair.energy\/en\/poland-qair-commissions-17-5-mw-wind-park-in-wadroze-wielkie\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/oldprod.qair.energy\/en\/poland-qair-commissions-17-5-mw-wind-park-in-wadroze-wielkie\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/oldprod.qair.energy\/en\/wp-content\/uploads\/sites\/2\/2023\/04\/MicrosoftTeams-image-7-scaled.jpg\",\"datePublished\":\"2023-04-21T10:57:03+00:00\",\"dateModified\":\"2023-04-21T10:57:17+00:00\",\"author\":{\"@id\":\"https:\/\/oldprod.qair.energy\/en\/#\/schema\/person\/6239371055ea22a4ce4115c014e5ca6e\"},\"description\":\"Qair announces the commissioning of a 17.5 MW Wind Park located in the W\u0105dro\u017ce Wielkie commune.\",\"breadcrumb\":{\"@id\":\"https:\/\/oldprod.qair.energy\/en\/poland-qair-commissions-17-5-mw-wind-park-in-wadroze-wielkie\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/oldprod.qair.energy\/en\/poland-qair-commissions-17-5-mw-wind-park-in-wadroze-wielkie\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/oldprod.qair.energy\/en\/poland-qair-commissions-17-5-mw-wind-park-in-wadroze-wielkie\/#primaryimage\",\"url\":\"https:\/\/oldprod.qair.energy\/en\/wp-content\/uploads\/sites\/2\/2023\/04\/MicrosoftTeams-image-7-scaled.jpg\",\"contentUrl\":\"https:\/\/oldprod.qair.energy\/en\/wp-content\/uploads\/sites\/2\/2023\/04\/MicrosoftTeams-image-7-scaled.jpg\",\"width\":2560,\"height\":1920,\"caption\":\"W\u0105dro\u017ce Wielkie\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/oldprod.qair.energy\/en\/poland-qair-commissions-17-5-mw-wind-park-in-wadroze-wielkie\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Accueil\",\"item\":\"https:\/\/oldprod.qair.energy\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Poland: Qair commissions 17.5 MW Wind Park in W\u0105dro\u017ce Wielkie\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/oldprod.qair.energy\/en\/#website\",\"url\":\"https:\/\/oldprod.qair.energy\/en\/\",\"name\":\"Qair Group - EN\",\"description\":\"Un site utilisant WordPress\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/oldprod.qair.energy\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/oldprod.qair.energy\/en\/#\/schema\/person\/6239371055ea22a4ce4115c014e5ca6e\",\"name\":\"groupcommunication\",\"url\":\"https:\/\/oldprod.qair.energy\/en\/author\/groupcommunication\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Poland: Qair commissions 17.5 MW Wind Park in W\u0105dro\u017ce Wielkie - Qair Group - EN","description":"Qair announces the commissioning of a 17.5 MW Wind Park located in the W\u0105dro\u017ce Wielkie commune.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/oldprod.qair.energy\/en\/poland-qair-commissions-17-5-mw-wind-park-in-wadroze-wielkie\/","og_locale":"en_US","og_type":"article","og_title":"Poland: Qair commissions 17.5 MW Wind Park in W\u0105dro\u017ce Wielkie - Qair Group - EN","og_description":"Qair announces the commissioning of a 17.5 MW Wind Park located in the W\u0105dro\u017ce Wielkie commune.","og_url":"https:\/\/oldprod.qair.energy\/en\/poland-qair-commissions-17-5-mw-wind-park-in-wadroze-wielkie\/","og_site_name":"Qair Group - EN","article_published_time":"2023-04-21T10:57:03+00:00","article_modified_time":"2023-04-21T10:57:17+00:00","og_image":[{"width":2560,"height":1920,"url":"https:\/\/oldprod.qair.energy\/en\/wp-content\/uploads\/sites\/2\/2023\/04\/MicrosoftTeams-image-7-scaled.jpg","type":"image\/jpeg"}],"author":"groupcommunication","twitter_card":"summary_large_image","twitter_misc":{"Written by":"groupcommunication","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/oldprod.qair.energy\/en\/poland-qair-commissions-17-5-mw-wind-park-in-wadroze-wielkie\/","url":"https:\/\/oldprod.qair.energy\/en\/poland-qair-commissions-17-5-mw-wind-park-in-wadroze-wielkie\/","name":"Poland: Qair commissions 17.5 MW Wind Park in W\u0105dro\u017ce Wielkie - Qair Group - EN","isPartOf":{"@id":"https:\/\/oldprod.qair.energy\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/oldprod.qair.energy\/en\/poland-qair-commissions-17-5-mw-wind-park-in-wadroze-wielkie\/#primaryimage"},"image":{"@id":"https:\/\/oldprod.qair.energy\/en\/poland-qair-commissions-17-5-mw-wind-park-in-wadroze-wielkie\/#primaryimage"},"thumbnailUrl":"https:\/\/oldprod.qair.energy\/en\/wp-content\/uploads\/sites\/2\/2023\/04\/MicrosoftTeams-image-7-scaled.jpg","datePublished":"2023-04-21T10:57:03+00:00","dateModified":"2023-04-21T10:57:17+00:00","author":{"@id":"https:\/\/oldprod.qair.energy\/en\/#\/schema\/person\/6239371055ea22a4ce4115c014e5ca6e"},"description":"Qair announces the commissioning of a 17.5 MW Wind Park located in the W\u0105dro\u017ce Wielkie commune.","breadcrumb":{"@id":"https:\/\/oldprod.qair.energy\/en\/poland-qair-commissions-17-5-mw-wind-park-in-wadroze-wielkie\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/oldprod.qair.energy\/en\/poland-qair-commissions-17-5-mw-wind-park-in-wadroze-wielkie\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/oldprod.qair.energy\/en\/poland-qair-commissions-17-5-mw-wind-park-in-wadroze-wielkie\/#primaryimage","url":"https:\/\/oldprod.qair.energy\/en\/wp-content\/uploads\/sites\/2\/2023\/04\/MicrosoftTeams-image-7-scaled.jpg","contentUrl":"https:\/\/oldprod.qair.energy\/en\/wp-content\/uploads\/sites\/2\/2023\/04\/MicrosoftTeams-image-7-scaled.jpg","width":2560,"height":1920,"caption":"W\u0105dro\u017ce Wielkie"},{"@type":"BreadcrumbList","@id":"https:\/\/oldprod.qair.energy\/en\/poland-qair-commissions-17-5-mw-wind-park-in-wadroze-wielkie\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Accueil","item":"https:\/\/oldprod.qair.energy\/en\/"},{"@type":"ListItem","position":2,"name":"Poland: Qair commissions 17.5 MW Wind Park in W\u0105dro\u017ce Wielkie"}]},{"@type":"WebSite","@id":"https:\/\/oldprod.qair.energy\/en\/#website","url":"https:\/\/oldprod.qair.energy\/en\/","name":"Qair Group - EN","description":"Un site utilisant WordPress","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/oldprod.qair.energy\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/oldprod.qair.energy\/en\/#\/schema\/person\/6239371055ea22a4ce4115c014e5ca6e","name":"groupcommunication","url":"https:\/\/oldprod.qair.energy\/en\/author\/groupcommunication\/"}]}},"_links":{"self":[{"href":"https:\/\/oldprod.qair.energy\/en\/wp-json\/wp\/v2\/posts\/2562","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/oldprod.qair.energy\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/oldprod.qair.energy\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/oldprod.qair.energy\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/oldprod.qair.energy\/en\/wp-json\/wp\/v2\/comments?post=2562"}],"version-history":[{"count":23,"href":"https:\/\/oldprod.qair.energy\/en\/wp-json\/wp\/v2\/posts\/2562\/revisions"}],"predecessor-version":[{"id":2588,"href":"https:\/\/oldprod.qair.energy\/en\/wp-json\/wp\/v2\/posts\/2562\/revisions\/2588"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/oldprod.qair.energy\/en\/wp-json\/wp\/v2\/media\/2572"}],"wp:attachment":[{"href":"https:\/\/oldprod.qair.energy\/en\/wp-json\/wp\/v2\/media?parent=2562"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/oldprod.qair.energy\/en\/wp-json\/wp\/v2\/categories?post=2562"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/oldprod.qair.energy\/en\/wp-json\/wp\/v2\/tags?post=2562"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}